2017 (no technical changes; reaffirmed as current practice)
H. Upon failure, Contractor shall drain area, allow membrane to dry, repair, and retest per same procedure at no additional cost. astm d595798 pdf free
D. Flood each designated area with clean potable water to a minimum depth of 2 inches (50 mm) at the shallowest point. 2017 (no technical changes; reaffirmed as current practice)